Wind Matters from the Canadian Wind Energy Association

BC continues to invest in wind power. The government has approved a new development in northeastern BC. The Tumbler Ridge Wind Energy project, a new development in northeastern BC, will generate enough power to provide electricity for up to 18,000 homes. There will be 50 wind turbines installed.

In Nova Scotia the COMFIT program continues to support locally-based renewable energy projects. The program is part of the province’s 2010 Renewable Electricity Plan. The province has approved five new projects.

  • two 800-kilowatt wind projects in Barney’s River, Pictou Co., owned by Northumberland Wind Field.
  • a four-megawatt wind project in Barrachois, Cape Breton Regional Municipality, and a 2.3-megawatt wind project in Gaetz Brook, Halifax Regional Municipality, owned by Wind4all Communities.
  • a 50-kilowatt wind project on the campus of Université Ste-Anne in Church Point, Digby Co.
  • a 4.8-megawatt project in Kemptown, Colchester Co., owned by Affinity Renewables, a not-for-profit organization owned by the Nova Scotia SPCA.
  • a 1.99-megawatt project in Marion Bridge, Cape Breton Regional Municipality, owned by Celtic Current.

And Health Canada has extended its public comment period on the proposed research design and methodology for its study on wind turbine noise and health. September 7 is the new deadline for comments. The study, which will be done in collaboration with Statistics Canada, will be focused on 2,000 homes selected from 8-12 wind turbine installation facilities in Canada. Researchers will interview residents and measure noise levels inside and outside of each home.

Leave a Reply

Your email address will not be published. Required fields are marked *